Sharing: We posted photos about the different stages of the lighting project on our Facebook page (building | sign), did a story in our August 2018 Connections newsletter, and talked about it at the annual meeting. We also hosted a group of electrical students from Minnesota West that learned about our lighting project, electric car, and recently installed generator that provides backup power.
Reactions: At first employees thought the new LED lights were too bright, but they adjusted within a week and we now have a better lit facility. Plus, the outside lights are white instead of orange, providing better quality lighting with more coverage.